Machinery, building materials, solar, agricultural equipment and consumer goods — through Mombasa and Dar es Salaam, with PVoC inspection booked at production.
East Africa runs on a Pre-Export Verification of Conformity regime. Goods must be inspected in China, before shipment, by an appointed agency — and a container that arrives without a Certificate of Conformity faces destination testing, penalty and delay.
We book PVoC inspection alongside production, which costs nothing extra in time and removes the single largest risk in the shipment.
Door-to-port sea transit from South China, excluding production time and destination clearance. Add 3–5 weeks around Chinese New Year.
| Destination | Typical transit |
|---|---|
| Mombasa, Kenya | 26–38 days from South China |
| Dar es Salaam, Tanzania | 28–40 days |
| Nairobi (inland, via Mombasa) | +4–8 days |
| Air — Nairobi (NBO) | 5–9 days |
Send a photo, a drawing, a link or a sample reference on WhatsApp — you will have a considered reply, usually within one working day.